

Vivifying Reflective Floating Long Dog Lead 10M 32ft Green with Soft Handle
Next-day delivery · £1.99
Order by 2pm for same-day dispatch · FREE over £35
Standard UK DeliveryFREE — get it by Mon 26 Oct – Thu 29 Oct
Sold by Bubble Booth ✓ (1)
More options (2)

Green
£10.99
This option

Orange
£11.99
Delivery
Details
About this item
Key Features
- Brand: Vivifying
- Length: 10 meters / 32 feet
- Thickness: 0.8 cm / 0.3 inch
- Material: Lightweight, non-absorbent, floating
- Reflective: High reflective threads for night visibility
- Handle: Soft padded cotton for comfortable grip
- Clasp: 360° rotating metal clasp for easy attachment
- Usage: Training, camping, hiking, swimming, beach and lake environments
Specifications
- Type: Long dog leash / check cord
- Color: Reflective Green
- Safety: Visible in low light, floating design reduces load in water
Product Description
The Vivifying long dog lead provides extended control during outdoor activities while keeping your dog safely tethered. It features a soft padded handle for comfortable long-term use, high visibility reflective threads for night walks, and a 360° rotating clasp for unrestricted movement. Ideal for recall training, hiking, camping, swimming, and beach or lake trips.
Details
Compare sellers (1)
Every offer is covered by UKyard buyer protection and 30-day returns.
Condition Brand new
Free UK delivery · 3–5 days
Get it by Mon 26 Oct – Thu 29 Oct
Customer reviews
No reviews yet — reviews come only from verified UKyard buyers.
Sign in to review a product you've bought.
You might also like

Halti
Halti Training Lead double ended no-pull small 2m burnt orange

Halti
Halti Training Lead Double-Ended No-Pull Large Black 2m - Lightweight Durable

Halti
Halti Training Lead - Double-Ended No-Pull Dog Lead, 2m Small Black

Halti
Halti Training Lead Double-Ended Dog Lead Large 2m Deep Walnut

Loutep
Loutep Training Lead for Dogs 3m 5m 10m 15m 20m 25m 30m Nylon Leash with Padded

Loutep
Loutep Training Lead for Dogs 3m 30m Nylon Rope Padded Handle Swivel Hook

Total Pet
Total Pet 15m Training Lead for Dogs & Puppies Long Line Leash 2mm Nylon

Loutep
Loutep Training Lead for Dogs 3m to 30m Nylon Leash with Padded Handle

Vivifying
£10.99