yard
Vivifying Long Dog Lead 10M Reflective Floating with Soft Handle Orange
In Stock
1 / 9

Vivifying Long Dog Lead 10M Reflective Floating with Soft Handle Orange

IN STOCK
£11.99Inc. VAT

Next-day delivery · £1.99

Order by 2pm for same-day dispatch · FREE over £35

Standard UK DeliveryFREE — get it by Sun 25 Oct – Wed 28 Oct

Sold by Bubble Booth ✓ (1)

Qty
1
MonzoNatWestRevolut+Apple PayGoogle PayKlarnaVisaMastercard

More options (2)

Vivifying Long Dog Lead 10M Reflective Floating with Soft Handle Orange

Orange

£11.99

This option

Vivifying Reflective Floating Long Dog Lead 10M 32ft Green with Soft Handle

Green

£10.99

Delivery

Standard UK Delivery·3–5 daysFREE
Next Day UK Delivery·1 day·Free over £35£1.99
EU Delivery·7–14 days£12.99
Worldwide Delivery·14–28 days£19.99
Same-day dispatchOrder by 2pm, Mon–Fri
30-day returns30 days to change your mind
Buyer protectionEvery order covered
Secure paymentProcessed by Mollie

About this item

Key Features

  • Brand: Vivifying
  • Length: 10 m / 32 ft
  • Thickness: 0.8 cm / 0.3 inch
  • Material: Non-absorbent, floating leash ideal for water activities
  • Reflective: High reflective threads for visibility in low light
  • Handle: Soft padded cotton for comfortable grip
  • Clasp: 360° rotating metal clasp for easy attachment and freedom of movement

Specifications

  • Type: Long training leash
  • Color: Reflective Orange
  • Use: Training, camping, hiking, swimming, beach and lake activities
  • Weight: Lightweight design to minimize burden on dog

Description

The Vivifying Long Dog Lead provides extended reach for recall training and outdoor exploration while maintaining control. The 10-meter length, floating non-absorbent material, and reflective threads enhance safety during night walks and water-based activities. A soft padded handle ensures comfortable use during long training sessions. Includes a 360° rotating metal clasp for secure, versatile attachment.

Details

Product codeUKP-FIBZ
BrandVivifying
Codes0712190577872 (EAN) · 712190577872 (UPC)

Compare sellers (1)

Every offer is covered by UKyard buyer protection and 30-day returns.

Condition Brand new

Free UK delivery · 3–5 days

Get it by Sun 25 Oct – Wed 28 Oct

£11.99

Customer reviews

No reviews yet — reviews come only from verified UKyard buyers.

Sign in to review a product you've bought.

You might also like

Vivifying

£11.99

Your basket

Add £35.00 more for free express delivery — standard delivery is always free

Your basket is empty

Start shopping